Theme Park IQ Logo
Theme Park IQ
Construction Tracker

Disneyland Construction Tracker

Track every building permit, renovation, and new project at the Disneyland Resort.

Permit map

All permits
Active
In Review
On Hold

Recent permit activity

New permits, revisions and status changes

DTD - Star Wars Trading Post/BLDG DD - Tenant Improvement: Remove (1) sliding storefront door system, track in ceiling and (3) air curtains. Install (3) coiling security doors with new track and modify existing columns. With electrical.

Plan revision updated: BLD2026-02705-REV02 · Log in to see what changed

11 hours ago

DLR - Main Street/Block 200 - Tenant Improvement: Replace boiler unit and provide connections to hot water plant. With mechanical, electrical and plumbing.

New plan revision for BLD2026-03059

12 hours ago

DLR - DCA Central Energy Plant - Electrical: Install receptacles and LED fixtures in office.

New plan revision for BLD2026-04983

12 hours ago

GCH - Ground Level - Tenant Improvement: Install new new heat exchangers and water softener in existing mechanical room. Equipment anchored to new concrete pad. With mechanical, electrical and plumbing. (BLD2026-02496)

Plan revision updated: BLD2026-02214-REV02 · Log in to see what changed

12 hours ago

DCA - BOH - World Of Color - Site Work: Construct 100 ln. ft. x 15 ft. high enclosure with 640 sq. ft. metal roof cover and install new compressor equipment on concrete pads. With electrical, mechanical and plumbing.

Permit updated: BLD2026-05728 · Log in to see what changed

14 hours ago

DCA - BOH - World Of Color - Site Work: Construct 100 ln. ft. x 15 ft. high enclosure with 640 sq. ft. metal roof cover and install new compressor equipment on concrete pads. With electrical, mechanical and plumbing.

New permit filed: BLD2026-05728

14 hours ago

DLR - It's A Small World/Holiday - Install (1) illuminated sign attached to building and (2) non-illuminated signs attached to existing arch structures.

Permit updated: SGN2026-00132 · Log in to see what changed

18 hours ago

DCA - Stage 12 - Holiday Special - Miscellaneous: Install (1) work platform, (2) truss arches and (2) truss towers. (11-06-26 thru 1-09-27)

Permit updated: BLD2026-04898 · Log in to see what changed

18 hours ago

DLR - It's A Small World/Holiday - Miscellaneous: Install clockface Santa hat structure attached to existing arch with new supporting frame..

Permit updated: BLD2026-04925 · Log in to see what changed

18 hours ago

DLR - Chester's Drawers/Block 500 #1113 - Tenant Improvement: 1,691 sq ft interior tenant improvement. With electrical and mechanical.

Permit updated: BLD2025-05161 · Log in to see what changed

1 day ago

Permit data is sourced from publicly available records on the City of Anaheim building permit portal. Theme Park IQ is not affiliated with the City of Anaheim or The Walt Disney Company. We organize and present this public information to make it easier to follow construction activity at the Disneyland Resort.

Theme Park IQ Logo Theme Park IQ

© 2023-2026 Theme Park IQ. All rights reserved.

Theme Park IQ and IQ Brands, LLC are in no way associated with the Walt Disney Company, NBCUniversal, or any other theme park owners, operators, or their subsidiaries or affiliates.

Theme Park IQ's sole purpose is to help park goers with their trip planning and in-park experience.